- Sep 04, 2022
-
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-
- Sep 03, 2022
-
-
David Lanzendörfer authored
Working on STL and cutout for acrylics
-
David Lanzendörfer authored
Having a more precise drill hole placement by directly extruding the sheets from the SVGs
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-
- Aug 30, 2022
-
-
David Lanzendörfer authored
Joining large screw groups
-
David Lanzendörfer authored
Adding some more screw holes
-
David Lanzendörfer authored
Cutting some holes for the hands and fixing some design issues with the plug for the tube.
-
- Aug 29, 2022
-
-
David Lanzendörfer authored
* Added neoprene gloves * Added rubber material asset * Drew initial fixture for fixing the air duct tube
-
David Lanzendörfer authored
Adding assets
-
- Aug 28, 2022
-
-
David Lanzendörfer authored
* Fixing positioning of fans * Adding grated metal * Adding the air duct
-
- Aug 27, 2022
-
-
David Lanzendörfer authored
-
- Apr 11, 2021
-
-
David Lanzendörfer authored
-
David Lanzendörfer authored
-